Home » Research » Advanced Fuel Cycle Cost Basis Report » What-it-Takes Cost Data by Module
Cost Basis Report

What-it-Takes Cost Data by Module

View and export (CSV format) cost data per module by using the tabs below. To view, search, and export (CSV format) the full table, see Grand What-It-Takes Cost Table.

Mining and Milling

Scroll right to view all data

ModuleUnit Cost of Fuel Cycle OperationUnitsYear of Last Technical RevisionLow CostMean CostHigh CostMode Cost Year Escalated toEscalation FactorLow CostMean CostHigh CostMode Cost Round to nearest
A1Uranium Mining and Milling$/kgU202035.8145.2310.289.520231.1641.5168.5360.0103.90.1
A2Thorium Mining and Milling$/kgTh202024.297.9209.059.420231.1628.6113.3242.069.31.1
What-it-takes - last technical revisionWhat-it-takes - escalated to 2023

Conversion

Scroll right to view all data

ModuleUnit Cost of Fuel Cycle OperationUnitsYear of Last Technical RevisionLow CostMean CostHigh CostMode Cost Year Escalated toEscalation FactorLow CostMean CostHigh CostMode Cost Round to nearest
What-it-takes - last technical revisionWhat-it-takes - escalated to 2023
BU3O8 - UF6 Conversion$/kgU20206.0011.9017.90N/A20231.3817.013.820.8#VALUE!0.1

Module C: Enrichment

Scroll right to view all data

ModuleUnit Cost of Fuel Cycle OperationUnitsYear of Last Technical RevisionLow CostMean CostHigh CostMode Cost Year Escalated toEscalation FactorLow CostMean CostHigh CostMode Cost Round to nearest
What-it-takes - last technical revisionWhat-it-takes - escalated to 2023
C1Uranium Enrichment up to 4.95% U-235 (Conventional LWR LEU SWUs)$/kgU20179712515412520231.454119.0153.0188.0153.01
C2Highly Enriched Uranium Blend Downnot evaluated
C3aUranium Enrichment between 5% and 9.75% U-235 (CAT-III HALEU SWUs)Percent SWU premium above LEU SWU prices in C1 above20215132020231.165.614.422.20.00.01
C3bUranium Enrichment between 10% and 19.75% U-235 (CAT-II HALEU SWUs)Percent SWU premium above LEU SWU prices in C1 above20213152720231.163.316.630.00.00.01
C3cHALEUF6 unit cost including all front end costs from rows C1, C3a, and C3b above .$/kgU as HALEUF62021740014000230001100020231.168200.015500.025500.012200.0100
C3dMetallization cost from CAT-III HALEUF6$/kgU as U-metal shards2021200600100020231.16220.0670.01110.00.010
C3eDeconversion cost from CAT-III HALEUF6 to UO3$/kgU as clean UO32021100550100020231.16110.0610.01110.00.010
C3fMetallization cost from CAT-II HALEUF6$/kgU as U-metal shards202110002000300020231.161110.02220.03330.00.010
C3gDeconversion cost from CAT-II HALEUF6 to UO3$/kgU as clean UO320215001250200020231.16550.01390.02220.00.010

Contact Handled Fuel Fabrication

Scroll right to view all data

ModuleUnit Cost of Fuel Cycle OperationUnitsYear of Last Technical RevisionLow CostMean CostHigh CostMode Cost Year Escalated toEscalation FactorLow CostMean CostHigh CostMode Cost Round to nearest
What-it-takes - last technical revisionWhat-it-takes - escalated to 2023
D1-1aLWR UO2 Fuel Fabrication: PWR V-LEU$/kgU202024242360542120231.16281.0491.0702.0489.01
D1-1bLWR UO2 Fuel Fabrication: PWR R-LEU$/kgU202026346366845820231.16305.0537.0775.0531.01
D1-1cLWR UO2 Fuel Fabrication: BWR V-LEU$/kgU202030044260542120231.16348.0513.0702.0489.01
D1-1dLWR UO2 Fuel Fabrication: BWR R-LEU$/kgU202033249566848620231.16385.0574.0775.0564.01
D1-2LWR MOX Fuel Fabrication: PWR MOX (Fuel fabricated from clean separated Pu)$/kgHM20207081016143091020231.16822.01178.01660.01056.02
D1-2LWR MOX Fuel Fabrication: PWR MOX (Fuel fabricated from separated Pu requiring additional glovebox shielding and remote maintenance)$/kgHM202096314102009125920231117.01636.02331.01461.01
D1-3Gas-Cooled Reactor Fuels: HTR TRISO$/kgU2020100046679000400020231.161160.05416.010443.04642.01
D1-4Ceramic Pelletized Fast Reactor Fuel: FR MOX$/kgHM2020123816142118148620231.161400.01900.02500.01700.0100
D1-4Ceramic Pelletized Fast Reactor Fuel: FR UOX$/kgHM2020165522443027204920231.161920.02600.03510.02380.010
D1-4Ceramic Pelletized Fast Reactor Fuel: FR UOX Blanket$/kgHM202037744854642220231.16440.0520.0630.0490.010
D1-5VIPAC U,Pu SFR MOX$/kgHM2020111414531906133820231.161293.01686.02212.01553.01
D1-5VIPAC U,Pu LWR MOX$/kgHM2020637914128781920231.16739.01061.01493.0950.01
D1-6A.4SFR UOX Blanket$/kgU202028451272651220231.16330.0594.0842.0594.01
D1-6A.5SFR U-Metal Blanket Fuel$/kgU202028941757938220231.16335.0484.0672.0443.01
D1-6A.6Low-enriched HALEU-Metal Fuel in Cat III Facility$/kgU2020404640101050520231.16469.0743.01172.0586.01
D1-6A.7Reprocessed and Re-enriched Low-enriched HALEU in Cat III Facility$/kgU2020455707111155620231.16528.0820.01289.0645.01
D1-6A.8Never-irradiated Low-enriched HALEU Metal Fuel in Cat II Facility$/kgU2020111113131515131320231.161290.01520.01760.01520.010
D1-6A.9Reprocessed and Re-enriched HALEU in Cat III Facility$/kgU2020181821552525212120231.162110.02500.02930.02460.010
D1-6A.10SFR UOX MEU Startup Fuel$/kgU2020547950135784720231.16630.01100.01570.0980.010
D1-6A.11HEU Speciality Fuels$/kgU202011000650001580002600020231.1613000.075000.0183000.030000.01000
D1-6B.6SFR U,Pu,Zr metal driver fuel from LWR-SNF$/kgHM2020115415031968138520231.161340.01740.02280.01610.010
D1-6B.7SFR U,Pu,Zr metal driver fuel from SFR-SNF$/kgHM2020151120072743186520231.161750.02330.03180.02160.010
D1-7CANDU Fuel: CANDU Nat U$/kgU202013221931621020231.16153.0254.0367.0244.01
D1-7aFront-end deconversion adder$/kgU20203248634920231.1637.056.073.057.01
D1-7rCANDU Fuel: CANDU SEU or LWR RepU$/kgU202016326737926020231.16189.0310.0440.0302.01
D1-8Thorium-based Fuel: U,Th MOX$/kgHM202032757381857320231.16379.0665.0949.0665.01
D1-8Thorium-based Fuel: Thoria Blanket$/kgTh202027348368749020231.16317.0560.0797.0569.01
D1-9Inert Matrix and Other Advanced Fuels
F2/D2-1AMetallic Fast Reactor Fuel Re-fabrication (See Module F2)$/kgHM2020285050007100500020231.163300.05800.08250.05800.050
F2/D2-1BRemote Fabrication$/kgHM2020105219502850195020231.161200.02250.03300.02250.050
F2D2-2Gas-solid phase chemistry separations and fuel fabrication$/kgHM2020105026004200250020231.161200.03000.04850.02900.050

Material Storage

Scroll right to view all data

ModuleUnit Cost of Fuel Cycle OperationUnitsYear of Last Technical RevisionLow CostMean CostHigh CostMode Cost Year Escalated toEscalation FactorLow CostMean CostHigh CostMode Cost Round to nearest
What-it-takes - last technical revisionWhat-it-takes - escalated to 2023
E1Wet Storage of Spent Nuclear Fuel
E2 Dry Storage of Spent Nuclear Fuel
E3-1aRecycled Combined Actinide Product Storage (Stand-alone Facility)$/yr per kg of total Pu+MA2020393754487158524920231.164568.06322.08306.06091.01
E3-1bRecycled Combined Actinide Product Storage (Co-Located Facility)$/yr per kg of total Pu+MA2020715989130095320231.16830.01148.01508.01106.01
E3-2aRecycled PuO2 Product Storage before MOX fabrication (Stand-alone)$/yr per kg of Pu2020238631423937310220231.162769.03646.04568.03600.01
E3-2bRecycled PuO2 Product Storage before MOX fabrication (Co-Located Facility)$/yr per kg of Pu202043357071556320231.16502.0661.0830.0653.01
E4Managed Decay Storage of selected separated FPs$/kg of Cs/Sr20201193026843417552684320231.1613843.031148.048452.031148.01

Consolidated Interim Storage

Scroll right to view all data

ModuleUnit Cost of Fuel Cycle OperationUnitsYear of Last Technical RevisionLow CostMean CostHigh CostMode Cost Year Escalated toEscalation FactorLow CostMean CostHigh CostMode Cost Round to nearest
What-it-takes - last technical revisionWhat-it-takes - escalated to 2023
I-3cConsolodated Interim Storage Case 3$/kgHM20208416021018620231.1697.0186.0244.0216.01
I-4cConsolodated Interim Storage Case 4$/kgHM202023246363652120231.16269.0537.0738.0605.01

Spent Fuel Reprocessing

Scroll right to view all data

ModuleUnit Cost of Fuel Cycle OperationUnitsYear of Last Technical RevisionLow CostMean CostHigh CostMode Cost Year Escalated toEscalation FactorLow CostMean CostHigh CostMode Cost Round to nearest
What-it-takes - last technical revisionWhat-it-takes - escalated to 2023
F1-coexSNF Aqueous Reprocessing Facility: COEX Aqueous Separations only for UOX UNF$/kgHM202090011001300110020231.161050.01300.01500.01300.050
F1-1aSNF Aqueous Reprocessing Facility: UREX+1a Aqueous Separation only for UOX UNF$/kgHM2020110013501600135020231.161300.01550.01850.01550.050
F1-3aSNF Aqueous Reprocessing Facility: UREX+3a Aqueous Separation only for UOX UNF$/kgHM2020125015501850155020231.161450.01800.02150.01800.050
F1-coex_TSNF Aqueous Reprocessing Facility: COEX Total Aqueous Reprocessing of UOX UNF$/kgHM2020130016331950165020231.161500.01900.02250.01900.050
F1-1a_TSNF Aqueous Reprocessing Facility: UREX+1a Total Aqueous Reprocessing of UOX UNF$/kgHM2020180022172650220020231.162100.02550.03100.02550.050
F1-3a_TSNF Aqueous Reprocessing Facility: UREX+3a Total Aqueous Reprocessing of UOX UNF$/kgHM2020200024832950250020231.162300.02900.03400.02900.050
F1-coexThSNF Aqueous Reprocessing Facility: COEX for Thorium-bearing fuels (Aqueous separations)$/kgHM202095012001450120020231.161100.01400.01700.01400.050
F1-1aThSNF Aqueous Reprocessing Facility: UREX+1a for Thorium-bearing fuels (Aqueous separations)$/kgHM2020115014501750145020231.161350.01700.02050.01700.050
F1-3aThSNF Aqueous Reprocessing Facility: UREX+3a for Thorium-bearing fuels (Aqueous separations)$/kgHM2020130016832050170020231.161500.01950.02400.01950.050
F1-CoexTh_TSNF Aqueous Reprocessing Facility: COEX Total Aqueous Reprocessing of UOX UNF$/kgHM2020130016331950165020231.161500.01900.02250.01900.050
F1-1aTh_TSNF Aqueous Reprocessing Facility: UREX+1a for Thorium-bearing fuels (Total Reprocessing)$/kgHM2020185024002900245020231.162150.02800.03350.02850.050
F1-3aTh_TSNF Aqueous Reprocessing Facility: UREX+3a for Thorium-bearing fuels (Total Reprocessing)$/kgHM2020210027003250275020231.162450.03150.03750.03200.050
F2/D2Electorchemical Reprocessing and Remote Fuel Fabrication: Integrated E-Chem and Remote Fabrication$/kgHM2017200026003200260020201.05421072740337227401

Waste Conditioning and Packaging

Scroll right to view all data

ModuleUnit Cost of Fuel Cycle OperationUnitsYear of Last Technical RevisionLow CostMean CostHigh CostMode Cost Year Escalated toEscalation FactorLow CostMean CostHigh CostMode Cost Round to nearest
What-it-takes - last technical revisionWhat-it-takes - escalated to 2023
G1-1AHigh-Level Waste (HLW) Conditioning, Storage, and Packaging: Aqueous-derived HLW Conditioning, Storage, Packaging (FP+Ln)$/kgFP2020260055006000790020231.163000.06400.07000.09200.0100
G1-2AHigh-Level Waste (HLW) Conditioning, Storage, and Packaging: Aqueous-derived Metal Alloy (Tc)$/kgTc202019310023600027620023860020231.16224100.0273900.0320500.0276900.0100
G1-2EHigh-Level Waste (HLW) Conditioning, Storage, and Packaging: Echem-derived co-flows (hulls, etc, other metal [nobles & Ln])$/kgFP20201430018000216001800020231.1616600.020900.025100.020900.0100
G1-3AHigh-Level Waste (HLW) Conditioning, Storage, and Packaging: Cs/Sr Solidification and Packaging$/kgCsSr20203660047000568004770020231.1642500.054500.065900.055400.0100
G2SNF Conditioning and Packaging: Spent UOX Conditioning & Packaging prior to longer-term disposition$/kgHM20206012016013020231.1670.0140.0190.0150.010
G3-1 LLW Conditioning, Storage, and Packaging: LLW Conditioning, Storage, Packaging (solids)$/m32020110024004600160020231.161300.02800.05300.01900.0100
G3-2 LLW Conditioning, Storage, and Packaging: LLW Cond, Storage, Packaging (liquids)$/m32020420015200277001380020231.164900.017600.032100.016000.0100
G3-3 LLW Conditioning, Storage, and Packaging: LLW Conditioning, Storage, Packaging (resins)$/m3202010190011330012460011330020231.16118200.0131500.0144600.0131500.0100
G4-1AGTCC Process Waste Conditioning, Storage, and Packaging: Aqueous-derived LLW-GTCC Offgas absorber (H3, Kr, Xe, Ru)$/m3 gas2020950013600179001340020231.1611000.015800.020800.015500.0100
G4-1EGTCC Process Waste Conditioning, Storage, and Packaging: Echem-derived LLW-GTCC Offgas absorber (H3, Kr, Xe, Ru)$/m3 gas2020950013600179001340020231.1611000.015800.020800.015500.0100
G5GTCC Secondary Waste Conditioning, Storage, and Packaging: GTCC Contact Handled-TRU Conditioning, Storage, and Packaging$/m320202270033000441003220020231.1626300.038300.051200.037400.0100

Near Surface Disposal

Scroll right to view all data

ModuleUnit Cost of Fuel Cycle OperationUnitsYear of Last Technical RevisionLow CostMean CostHigh CostMode Cost Year Escalated toEscalation FactorLow CostMean CostHigh CostMode Cost Round to nearest
What-it-takes - last technical revisionWhat-it-takes - escalated to 2023
JNear Surface Disposal$/m3 of pkg mat202055017503150155020231.16650.02050.03650.01800.050

Excess Uranium Conversion and Disposal

Scroll right to view all data

ModuleUnit Cost of Fuel Cycle OperationUnitsYear of Last Technical RevisionLow CostMean CostHigh CostMode Cost Year Escalated toEscalation FactorLow CostMean CostHigh CostMode Cost Round to nearest
What-it-takes - last technical revisionWhat-it-takes - escalated to 2023
K1-1Depleted Uranium Disposition (E-Plant Tails Deconversion and Packaging)$/kgDU20204.5479.16.820231.2235.08.011.08.01
K1-2Depleted Uranium Disposition (De-converted E-plant Tails Geologic Disposal as Stable Oxide form)$/kgDU20204.52145.313.620231.2235.025.053.016.01
K2Recovered U Disposition (Conv of "new" UNH to storable U3O8)$/kgU20174.612.619.41420231.2236.015.024.017.01
K2Recovered U Disp (Conv of "old" UNH to storable U3O8: incl aq polish)$/kgU201722.841.8574620231.22328.051.070.056.01
K2Recovered U Disp (Conv of "new" UNH to UF6 for re-enrichment)$/kgU20176.815.222.81620231.2238.019.028.020.01
K2Recovered U Disp (Conv of "old" UNH to UF6 for re-enr.: incl aq polish)$/kgU201733.74965.44920231.22341.060.080.060.01
K2Recovered U Disp (40-yr storage of U3O8)$/kgU2017817.534.21020231.22310.021.042.013.01
K2Recovered U Disp (Perm Geologic Disposal of U3O8)$/kgU201721.852.781.85520231.22327.064.0100.067.01
K2Recovered U Disp (Conv of "new" UNH to UF6 for re-enrichment)$/kgU2017N/AN/A6520231.2230.01
K2Recovered U Disp (Conv of "old" UNH to UF6 for re-enr.: incl aq polish)$/kgU2017N/AN/A10420231.2230.01
K3Recovered U Disp (Perm Geologic Disposal of metal or oxidized form)$/kgU201781.8114.61649820231.223100.0140.0201.0120.01
K3Recovered U-metal ingot 300 yr storage$/kgU201727.356.31093320231.22333.069.0133.040.01
K3Recovered U-metal conv to UF6 incl fluoride volatility purification$/kgU201732.747.265.44420231.22340.058.080.053.01
K3Recovered U-metal to purified UOX conversion for contact-handled MOX usage$/kgU201732.747.265.44420231.22340.058.080.053.01

Geologic Disposal

Scroll right to view all data

ModuleUnit Cost of Fuel Cycle OperationUnitsYear of Last Technical RevisionLow CostMean CostHigh CostMode Cost Year Escalated toEscalation FactorLow CostMean CostHigh CostMode Cost Round to nearest
What-it-takes - last technical revisionWhat-it-takes - escalated to 2023
L1Geologic Repository (SNF) [mass pricing]$/KgHM 202030061190862320231.16348.0709.01054.0723.01
L1Geologic Repository (HLW)$/kgFP2020156151987799623520231.161811.06032.09050.07235.01
L2Geologic Repository of GTCC Waste in enhanced confinement facilities
L2GTCC in Geologic Repository (co-located with HLW)

Transportation of Radioactive Materials

Scroll right to view all data

ModuleUnit Cost of Fuel Cycle OperationUnitsYear of Last Technical RevisionLow CostMean CostHigh CostMode Cost Year Escalated toEscalation FactorLow CostMean CostHigh CostMode Cost Round to nearest
What-it-takes - last technical revisionWhat-it-takes - escalated to 2023
O1From Reactor to Repository$/kg202024.82830.727.820231.1629.032.036.032.01
O1From Reactor to Central Storage Facility to Repository$/kg2020107.7111113.4110.520231.16125.0128.0132.0128.01
O255 gallon drum for yellow cake$/kg20202.133.82.820231.162.03.04.03.01
O2Paducah Tiger overpack for UF6 or DUF6 cylinder$/kg20201.21.31.51.320231.161.02.02.02.01
O2UX-30 for EUF6$/kg202015.71616.715.920231.1618.019.019.018.01
O2CHT-OP-TU for DUO2, UOX or LLW$/kg20201.82.53.42.420231.162.03.04.03.01
O29975 for TRU or TRUOX$/kg2020206.8340.3492.1321.820231.16240.0395.0571.0373.01
O2CNS10-160B for FP$/kg20204.76.68.76.420231.165.08.010.07.01
O2RH-TRU 72B for TRU or FP$/kg20207.410.814.610.420231.169.013.017.012.01
O2MCC-4 for PWR assemblies$/kg202045.647.349.247.220231.1653.055.057.055.01
O2SP-1,2,3 for BWR assemblies$/kg202068.172.076.471.520231.1679.084.089.083.01

Reactors and Transmuters

Scroll right to view all data

ModuleUnit Cost of Fuel Cycle OperationUnitsYear of Last Technical RevisionLow CostMean CostHigh CostMode Cost Year Escalated toEscalation FactorLow CostMean CostHigh CostMode Cost Round to nearest
What-it-takes - last technical revisionWhat-it-takes - escalated to 2023
R1Thermal LWR Reactor (Overnight Capital)$/kW(e)2017250041005800440020231.2233057.05013.07092.05380.01
R1Thermal LWR Reactor (Fixed component of O&M)$/yr/kW(e)20176073877320231.22373.089.0106.089.01
R1Thermal LWR Reactor (Variable component of O&M)$/MW-hr20170.81.82.71.820231.2231.02.03.02.01
R2Fast Reactors (Overnight Capital)$/kW(e)2017240047007600410020231.2232935.05747.09293.05013.01
R2Fast Reactors (Fixed component of O&M)$/yr/kW(e)20176578927620231.22379.095.0112.093.01
R2Fast Reactors (Variable component of O&M)$/MW-hr20171.12.12.92.220231.2231.03.04.03.01
R3Gas-Cooled Reactors (Overnight Capital)$/kW(e)2017270056008700540020231.2233301.06847.010638.06603.01
R3Gas-Cooled Reactors (Fixed component of O&M)$/yr/kW(e)2012N/AN/AN/AN/A20231.312
R3Gas-Cooled Reactors (Variable component of O&M)$/MW-hr2012N/AN/AN/AN/A20231.312
R5Pressurized Heavy Water Reactors (Overnight Capital)$/kW(e)2017240042006100420020231.2232935.05135.07459.05135.01
R5Pressurized Heavy Water Reactors (Fixed component of O&M)$/yr/kW(e)20176073877220231.22373.089.0106.088.01
R5Pressurized Heavy Water Reactors (Variable component of O&M)$/MW-hr20170.822.7220231.2231.02.03.02.01
R6Accelerator-driven Systems (ADS) (Accelerator Overnight cost)$/kW(e)20171500820015400770020231.2231834.010026.018830.09415.01
R6Accelerator-driven Systems (ADS) (Subcritical Reactor Overnight cost)$/kW(e)2017320055008400500020231.2233913.06725.010271.06114.01
R6Accelerator-driven Systems (ADS) (Accelerator fixed component of O&M)$/yr/kW(e)20175416627816620231.22366.0203.0340.0203.01
R6Accelerator-driven Systems (ADS) (Subcritical Reactor Fixed component of O&M)$/yr/kW(e)20176515325014320231.22379.0187.0306.0175.01
R6Accelerator-driven Systems (ADS) (Accelerator variable component of O&M)$/MW-hr2017N/AN/AN/AN/A20231.223
R6Accelerator-driven Systems (ADS) (Subcritical Reactor variable component of O&M)$/MW-hr2017N/AN/AN/AN/A20231.2231
R7Liquid-fueled Salt-Cooled Reactors (Overnight cost)$/kW(e)2017240061009800600020231.2232935.07459.011983.07336.01
R7Liquid-fueled Salt-Cooled Reactors (Fixed component of O&M)$/yr/kW(e)2017N/AN/AN/AN/A20231.2231
R7Liquid-fueled Salt-Cooled Reactors (variable component of O&M)$/MW-hr2017N/AN/AN/AN/A20231.2231
R8Solid-fueled Salt-cooled Reactors (Overnight cost)$/kW(e)2017220056008700600020231.2232690.06847.010638.07336.01
R8Solid-fueled Salt-cooled Reactors (Fixed component of O&M)$/yr/kW(e)2017N/AN/AN/AN/A20231.223
R8Solid-fueled Salt-Cooled Reactors (Variable component of O&M)$/MW-hr2017N/AN/AN/AN/A20231.223
R9-1Magnetic Confinement Fission/Fusion Hybrid (Fusion Reactor Component Capital Cost)$/kW(e)2017610011800174001200020231.2237459.014428.021275.014673.01
R9-1Magnetic confinement F/F Hybrid (Subcritical Fission Reactor Component:Capital Cost)$/kW(e)2017230048007200480020231.2232812.05869.08804.05869.01
R9-1Magnetic Confinement F/F Hybrid (Fusion Reactor Component:Fixed Component O&M)$/yr/kW(e)20178713117413120231.223106.0160.0213.0160.01
R9-1Magnetic Confinement F/F Hybrid (Subcritical Fission Reactor Component:Fixed Component of O&M Cost)$/yr/kW(e)20176514125010920231.22379.0172.0306.0133.01
R9-1Magnetic Confinement F/F Hybrid (Fusion Reactor Component:Variable Component O&M)$/MW-hr2017N/AN/AN/AN/A20231.223
R9-1Magnetic Confinement F/F Hybrid (Subcritical Fission Reactor Component:Variable Component of O&M Cost)$/MW-hr2017N/AN/AN/AN/A20231.223
R9-2Inertial Confinement F/F Hybrid (Fusion Reactor Component:Capital Cost)$/kW(e)20175400830010900870020231.2236603.010149.013328.010638.01
R9-2Inertial Confinement F/F Hybrid (Subcritical Fission Reactor Component:Capital Cost)$/kW(e)2017230048007200480020231.2232812.05869.08804.05869.01
R9-2Inertial Confinement F/F Hybrid (Fusion Reactor Component:Fixed O&M Cost)$/yr/kW(e)201754831098720231.22366.0101.0133.0106.01
R9-2Inertial Confinement F/F Hybrid (Subcritical Fission Reactor Component:Fixed O&M Cost)$/yr/kW(e)20176514125010920231.22379.0172.0306.0133.01
R9-2Inertial Confinement F/F Hybrid (Fusion Reactor Component:Variable O&M Cost)$/MW-hr2017N/AN/AN/AN/A20231.223
R9-2Inertial Confinement F/F Hybrid (Subcritical Fission Reactor Component:Variable O&M Cost)$/MW-hr2017N/AN/AN/AN/A20231.223